Change Log 04.26.09

Change log for Sunday, April 26th

Amber

  • Helped Matt hang the door to the boys’ room
  • Moved (yet even more) wood outside from the scrap pile outside the side door

 

Matt

  • Installed shutoff valves to the water lines under the kitchen sink to test if cold water comes out of the hot line.  It does, which means the water lines got reversed somewhere along the way.  Thankfully though it was the plumber who did it so he’s going to come and fix it sometime this week.  Sometimes it is nice to be responsible for everything!
  • Finished hanging the doors to Emma’s room and the boys’ room and installed the door hardware
  • Did some picking up and organizing