Change Log 05.02.09

Change Log for Saturday, May 2nd, 2009

Matt

  • Worked on the wood flooring upstairs – this was fairly challenging because the long wall is not straight, making the first run of flooring rather complicated.

Amber

  • Filled nail holes on the railing with wood putty
  • Finally finished the plug in the utility room that needed drywall repair, more paint, and spacers
  • Worked with Matt on the flooring so I could learn how to do it.  I may end up doing some of the flooring so Matt can do other things and so that work can proceed on that during the week as well.