Things are speeding up

All of a sudden, I’m feeling a bit overwhelmed…

The scheduled part of my day tomorrow
——————–
– 8 AM – go to hardware store and pay for lumber for a small workshop[1]

– After 8 AM – go to ReStore and see if they have windows and/or a door for said workshop

– 12 PM – meet with a contractor to discuss getting a pump and tank setup for our well and get copies of our site plan

– 1PM – meet with SHS to get our documents for submitting to county (Yeah!) for a permit.

– Before 4PM – submit paperwork with the county

Other things to fit in
——————
– Drop off stuff at storage unit
– Figure out what oil I need for our generator
– Pick up said oil
– Get gas for the generator
– Build ramps to move the generator in and out of truck
– Pick up the generator and other stuff from storage unit to take to the property
– Meet hardware store delivery truck on property (I hope) – there’s a chance they won’t be able to deliver tomorrow
– Meet with someone about a possible office space
– Eat lunch (it’s not pretty if this doesn’t happen)

The only bits that I’m really worried about are actually getting the material delivered and making sure that it doesn’t conflict with either of my afternoon meetings or submitting paperwork.


[1] I’m building a small 8’x16′ workshop to store tools in during construction and to get more experience with actual building.

3 thoughts on “Things are speeding up

  1. Eat Lunch? Does that mean you’ll be eating ‘Take-Out/Fast Food’ since you’ll be running around all day?

    Congratulations Matt! Welcome to the AtreNet Fat Friday Club!

Comments are closed.