Tuesday night I went down and scrubbed at the grouted tile with cheese cloth to get rid of the grout haze that wasn’t totally cleaned up. I also did some clean up for the plumber who started yesterday and ran a pull string for the phone service which was supposed to be installed yesterday.
Running pull string through 200 ft of conduit by yourself is a bit of a chore. I had the vacuum at the bottom and the string at the top and had to go back up a few times to free snags in the string.
Last night, Amber finished getting the grout haze off while I used the diamond blade to cut the anti-fracture membrane that was sticking out past the tile on one side. I can’t say often enough how great that diamond blade is. The whole space cleaned up well and Amber put sealer on while I went up and replaced the small, poly pull rope with mule tape. The phone guy didn’t have enough time to do the install yesterday but he came by to look at it and asked us to put in something bigger.
The phone service should be setup today or tomorrow.
The plumbing work is progressing well. It’s nice to have that taken off my plate.