I’m very close on finishing everything I need for the rough inspection. I’ve got an appointment with a guy next Saturday to talk about drywall and get a bid.
Recently completed:
- All ceiling fan boxes mounted and wired.
- Can lights on landing wired.
- Fixtures in kids bath mounted and wired.
- Master bedroom and master bath swept and vacuumed.
- Extra lumber moved outside (thanks, Jonathan)
- Wood flooring moved down from upstairs storage to kitchen area (thanks, Jonathan)
- Phone line pulled from phone box outside into house (thanks, Jonathan)
- Remaining electrical box in away room wired
- Telecom box in hearthroom nailed and wired