Today was the day – rough electrical, rough plumbing and rough framing.
There’s a few minor things that we need to fix but we’re all signed off.
The inspector was very impressed by the electrical panel (thanks, Chris).
All-in-all it was much simpler than I expected it to be. Now we’re on to drywall, then the finish work.