Change Log 04.14.09

Change log entry for Tuesday, April 14th, 2009

  • Boxed scrap Hardiboard and piled the big pieces
  • Moved more wood to burn area, bagged trash, heaved pieces of concrete into the gully (gotta love having acreage)
  • Loaded the trailer (with my father-in-law and Matt) with trash, recycling, Hardiboard, and other material that shouldn’t be burned. 
  • Installed plugs in the upstairs hallway and linen/telecom closet (don’t you have a linen/telecom closet?)  Felt like a very bad mother because Gregory pinched his finger with some unidentified tool (nippers of some sort?) and Nathan fussed (I wouldn’t let him scoot around on a second story area with no railing) all because Mommy was busy installing electrical outlets.