Change log for Wednesday, April 15th, 2009
Amber
- Installed plugs in Emma’s room
- Installed blank plate in linen/telecom closet to cover the light future
- Vacuumed downstairs
- Moved more scrap wood outside
- Planned newel post layout with Matt
Matt
- Sanded the floor where the first railing section will be installed
- Cut the base piece for a railing section and tacked it down
- Planned out the location of the balusters
I have also started a static page with the move-in list as of today. Here it is. I’m sure Matt will think of things I’ve forgotten and I’ll probably remember a few things as well. But this gives you an idea of what is left to do. The page is linked above the masthead.