Change Log 04.15.09

Change log for Wednesday, April 15th, 2009

Amber

  • Installed plugs in Emma’s room
  • Installed blank plate in linen/telecom closet to cover the light future
  • Vacuumed downstairs
  • Moved more scrap wood outside
  • Planned newel post layout with Matt

Matt

  • Sanded the floor where the first railing section will be installed
  • Cut the base piece for a railing section and tacked it down
  • Planned out the location of the balusters

I have also started a static page with the move-in list as of today.  Here it is.  I’m sure Matt will think of things I’ve forgotten and I’ll probably remember a few things as well.  But this gives you an idea of what is left to do.  The page is linked above the masthead.