Change Log 05.04.09

Change Log for Monday, May 4, 2009

I installed wood flooring upstairs for a couple hours.  The inspector came by and signed off on our propane lines, so we are set to get our tank installed.  Once the ground dries out a bit (we’ve gotten something like 3.5″ of rain since Friday!) I’ll bury the propane lines and get rid of all the open trenches we have outside our side door.  The tile guys are still hard at work and should be done sometime early next week.  The showers are looking really good and we’re really pleased with their work.