Change Log for Friday, May 8th, 2009
More flooring upstairs. At least I’m getting a little faster at it…
The linoleum flooring for the bathrooms, utility, mudroom and pantry also arrived today.
Change Log for Friday, May 8th, 2009
More flooring upstairs. At least I’m getting a little faster at it…
The linoleum flooring for the bathrooms, utility, mudroom and pantry also arrived today.
Change Log for Thursday, May 7, 2009
I picked up the plumbing pieces for the master bathroom shower and got some miscellaneous things at the hardware store. I tried to order the counter for the master bathroom, but found that the person who had given me the quote did it incorrectly and the real cost is more than double the original quote. So, we’re back to square one on the master bathroom counter. I picked up some formica samples, but I didn’t find anything particularly appealing. We may do sealed plywood temporarily and then do a concrete countertop in there after all.
The tile guys finished working on the master bathroom and it looks great. The downstairs bath is all ready to go once the tile comes in. They should be back on Thursday of next week to finish up that bathroom and will probably be done on Friday. I am so glad we subbed all this out, even if it is costing a fair amount. Tile is a lot of work, and it is very important that it is done correctly!
I went down to the house to work on the flooring in the afternoon, but Nathan didn’t nap like he usually does so I ended up not being able to do it. I’m hoping to get to work on it some more this afternoon if I can get Nathan to do his usual nap.
Change Log for Wednesday, May 6th, 2009
The tile guys are still working away and Matt worked on the flooring upstairs. We’re over half-way there!
Change log for May 5th, 2009
Matt and I both laid some flooring today. I’m starting to wish we had wider planks. It is slow going, but at least progress is being made. The tile is really looking nice though – I am so glad we hired this out. They are doing a wonderful job. If anyone around here needs tile work done, I definitely would recommend them.
Change Log for Monday, May 4, 2009
I installed wood flooring upstairs for a couple hours. The inspector came by and signed off on our propane lines, so we are set to get our tank installed. Once the ground dries out a bit (we’ve gotten something like 3.5″ of rain since Friday!) I’ll bury the propane lines and get rid of all the open trenches we have outside our side door. The tile guys are still hard at work and should be done sometime early next week. The showers are looking really good and we’re really pleased with their work.
Change Log for Sunday, May 3rd, 2009
Amber
Matt
Change Log for Saturday, May 2nd, 2009
Matt
Amber
Change Log for May 1, 2009
And yes, it is now May and we’re STILL not living in our house… *sigh*
Change Log for April 30, 2009
Change Log for Wednesday, April 29th
I also updated the move-in checklist this evening. I think I crossed off more things than I added…