Change Log 04.24.09

Change log for Friday, April 24th, 2009

  • Prepped three doorways for door hanging by pounding in the nails, trimming back the drywall, and marking the hinge heights on the doors.  
  • Vacuumed up the mess I made by trimming up the drywall, the kids’ bath, and some of the upstairs hall.
  • Made a tarpaper pattern for the shower area of the kids’ bath in order to make cutting the linoleum easier.  Started on the sink area, but didn’t get very far.  Played a rousing game of drop the granola bar with Nathan to keep him happy while he sat corralled in the bathtub and I worked.  Tar paper is stinky, icky to touch, and a pain to work with.  I am wondering if I can come up with an alternative for making floor patterns, as I have 6 more rooms to go.